37s · Watch video ↗Manufacturing
Inside Huayuan: factory and manufacturing
Explore Huayuan’s factory, metalworking, welding and inspection equipment in this 37-second film with Chinese–English captions and soft instrumental music.
HUAYUAN / VIDEO LIBRARY
See equipment at different stages: manufacturing, installation, operation and dispatch. Each video connects to relevant products and enquiry guidance.
37s · Watch video ↗Manufacturing
Explore Huayuan’s factory, metalworking, welding and inspection equipment in this 37-second film with Chinese–English captions and soft instrumental music.
30s · Watch video ↗Delivered projects
A 30-second photo film of delivered Huayuan project sites, showing boiler structures, pipework, access platforms and plant exteriors. The delivery status is confirmed by Huayuan.
53s · Watch video ↗Operation
See biomass fuel feeding, furnace combustion and boiler equipment in this 53-second site video supplied by Huayuan Boiler.
77s · Watch video ↗Operation
See a cow-dung-fired biomass steam boiler operating in Pakistan, with a steam capacity of 25 t/h. The video shows fuel handling, the boiler structure and furnace combustion. Fuel, location and capacity confirmed by Huayuan.
72s · Watch video ↗Project journey
This 25 t/h biomass steam boiler is located in Karachi, Pakistan. Huayuan identifies chicken manure, cow dung and rice husks as the project fuels. The video combines workshop and shipment photographs with on-site installation, controls, fuel handling and furnace combustion.
46s · Watch video ↗Customer site visit
Customers visit a waste-to-energy combined heat and power site, viewing automated monitoring, plant equipment, furnace combustion and waste handling, with discussion in the control room. This 46-second film has Chinese–English captions. The original titles refer to paper-mill waste, sludge and municipal waste.
42s · Watch video ↗Operating reference
Huayuan reports that the industrial boiler in this case used a fuel blend of 80% or more cow and chicken manure combined and operated continuously for six months without a boiler shutdown. This 42-second film shows fuel materials, handling equipment and furnace combustion, with Chinese–English captions.
25s · Watch video ↗Shipment
Watch lifting, loading and container packing for a 10 million kcal/h biomass thermal oil heater shipment to Pakistan. The video shows equipment prepared for dispatch from Huayuan.
22s · Watch video ↗Shipment
Workshop and dispatch footage of a boiler drum for a 220 t/h, 9.8 MPa steam boiler project in Kazakhstan. See the drum and its connections in the workshop, followed by the component loaded for transport.
16s · Watch video ↗Shipment equipment
Equipment footage supplied for a waste heat boiler shipment to Indonesia’s sulfuric acid industry. See the cylindrical body, tube-sheet end and side openings.
20s · Watch video ↗Installation
Watch boiler components being lifted and assembled on site, with views of the steel structure, pipework and installation team.
24s · Watch video ↗Installation
A close-up look at boiler tube banks and steelwork during installation. The company video identifies the site as Pakistan and is captioned 15 May 2025.
80s · Watch video ↗Project journey
Explore a 10 million kcal/h rice-straw-fired biomass thermal oil heater for a textile mill in Pakistan. The project film follows workshop manufacturing, shipment, site assembly, thermal oil circulation, controls and fuel feeding.
29s · Watch video ↗Site preparation
Site footage received from Pakistan on 21 October 2026 shows the conveyor, boiler exterior, pipework and control room. The source caption identifies the stage as preparation for ignition. Edited with Chinese–English captions and soft instrumental music.
Start with your fuel or heat source, required output and project location.
Use the enquiry checklist ↗